Multiply the two numbers to get the total square footage of your.
Removing concrete floor in basement.
Measure the width of the basement and then the length.
You can smell or see pet urine stains that no matter how much you bleach or wash with vinegar don t go away.
The most efficient way to remove a concrete floor is with a jackhammer.
Before you wash a concrete floor begin by clearing away everything from the basement floor such as boxes furniture and other items.
The jackhammering is begun about one foot in from the perimeter of the floor on one side of the room and continued until.
Although efflorescence is not harmful to cement excessive amounts of it may cause mold or insect problems.
Tearing up concrete yourself can also save you a ton of money.
The cost to remove a concrete slab starts at 8 17 9 93 per square foot but can vary significantly with site conditions and options.
That s a savings of about 1 000 on the cost to remove a concrete driveway.
Hiring a contractor just to demolish a 12 x 14 ft.
See professionally prepared estimates for concrete slab removal work.
If you do it yourself the cost to remove a concrete driveway will run you about 400 including rental and disposal.
Use a vacuum cleaner or push.
So you have a concrete floor perhaps an area in your basement garage patio or under your carpet in your home that seems to be permanently stained with pet urine a k a dog or cat pee.
Meanwhile sweep or wipe off the concrete removing as much loose dust dirt and debris as possible.
Coating thickness also has a major effect on the amount of stripper needed and how long it needs to stay on the surface.
Now proceed to work the soapy water or tsp into the concrete by means of a long handled brush.
Rake the dirt floor removing any rocks that are larger than a golf ball.
Patio could cost you 1 400 or more.
Remove heavy calcium deposits from concrete surfaces.
Before you start wet cleaning a concrete basement floor do a thorough clean up of the basement floor to remove the build up of everyday dirt and debris.
I have seen it take 12 to 24 hours for a biochemical stripper to remove a thick build epoxy from a concrete floor.