Roofing Up To A Wall

Roof Wall Plates Google Search Building A Shed Shed Construction Shed Roof

Roof Wall Plates Google Search Building A Shed Shed Construction Shed Roof

Wall Plate Google Search Roof Construction Roof Joist Roof Trusses

Wall Plate Google Search Roof Construction Roof Joist Roof Trusses

File Roofjoinerynames1 Jpg Diywiki Roof Construction Roof Architecture Roof Design

File Roofjoinerynames1 Jpg Diywiki Roof Construction Roof Architecture Roof Design

Pin On Construction Details

Pin On Construction Details

Image Result For Timber Parapet Wall Detail Roof Detail Parapet Roof

Image Result For Timber Parapet Wall Detail Roof Detail Parapet Roof

Pin On Roof

Pin On Roof

Pin On Roof

Install it through the entire thickness of the brick veneer.

Roofing up to a wall.

If the roof meets a wall that is parallel to the shingles roof up to the wall then slip a long continuous piece of flashing under the siding and on. All exterior wall coverings whether it is wood siding vinyl siding brick or stone veneer stucco etc. By code the membrane has to extend inboard of the exterior wall by 2 feet. Step 6 install through wall flashing.

There have always been problems with the flashing details at head walls rake walls and chimneys especially if stucco brick or stone veneer is used. We ask for 6 inches up the wall. Through wall flashing is necessary to redirect moisture that has penetrated the veneer back to the outside. Roof to wall flashing.

I made this video this morning and i hope it help explain the flashing wall detail where the siding meets the roof. The most common mistake at this intersection is to allow the metal coping to but up to the wall without the application of termination metal. Depending on the manufacturer s spec some roofing materials may require an ice barrier membrane on the entire roof. Where a wall is perpendicular to the roofing slip pieces of step flashing under the siding.

Step 7 flashing your chimney. Must be kept up off the surface of the roof a minimum 1 some manufacturers of exterior wall coverings require. The omittance of the termination metal leaves an opening at the top of the coping and allows for moisture infiltration at the space between the parapet. The flat roofing material must go up the wall a minimum of 12 or up the wall and over the top of the wall if the wall is less than 12 high.

Here is an attempt though maybe not a very good one to make the roof flashing serve also as a through the wall flashing with a tile roof. Apply a flashing piece then a shingle then flashing as you would apply step flashing for a chimney.

Pin On Obrobka Drewna

Pin On Obrobka Drewna

01 030 751 Roof Detail High Wall Low Roof Roof Detail High Walls Roof Design

01 030 751 Roof Detail High Wall Low Roof Roof Detail High Walls Roof Design

Scupper An Opening In A Wall Or Parapet For The Drainage Of Rainwater From A Roof Parapet Flat Roof Flat Roof Shed

Scupper An Opening In A Wall Or Parapet For The Drainage Of Rainwater From A Roof Parapet Flat Roof Flat Roof Shed

Pin On Metal Roofs

Pin On Metal Roofs

Source : pinterest.com